Customization: | Available |
---|---|
After-sales Service: | Lifetime After-Sales Service |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High Speed Full-automatic Disposable Breast Pads Making Production Line Machine
Designed Speed | 800pcs/min |
Stable Production Speed | 600pcs/min |
Production Line Center Distance | 300mm(the distance from the material center line to the rack-mounted panel) |
Distribution of Raw Material | top(surface)-absorption layer bottom-cloth like non-woven |
The Deviation of Products Weight | ±1.5g |
Rate of Finished Products | ≥85% (not including rejected baby diapers at the glue applicator,splicing and jointing material stations) |
Production Machine Efficiency | ≥85% |
Power Supply | 380V 50HZ |
Power Consumption | 240KW (reference)(not including the glue applicator station and the air compressor) |
Electric Supply | 380V ± 5%,50HZ, (3 phase,for wire plus ground) |
Compressed Air Supply Pressure | 0.6-0.8Mpa (air supplier provided by buyer) |
Overall Machine Dimensions(Stacker excluded) | 23m(L) *2m(W)*3.5m(H) (reference) weight 20 metric tons |
Equipment Process Flow | to be defined by customer |
Why Choose Us?
Profession design
Our factory has in machinery industrial for 15 years, improve and innovate technology from Japan and Italy all the time.
Quality
All the spare parts used according to the contract, original German & Japan & Italy & USA brand.
Processing
CNC processing, special surface processing, anti-glue processing.
Commitment
We will sign a letter of commitment while we sign the contract, which will improve your confidence to us.
Excellent After-sale Service
1. You can send technician to learn machine operation before the machine delivery for 1-2 month. We can offer food and accommodation.
2. When machine arrive your workshop, we will send technician to your workshop installing, testing the machine and training your workers.
3. If you need one Chinese technician work for you, we can help you find one work for you.
4. Life-long after service for the baby diaper machine
Q:Are you a machine manufacture or trading company?
A: We are a machine manufacture of baby diaper machine, adult diaper machine, pull on diaper machine, sanitary napkin machine, panty liner machine,underpad machine, pet pad machine, breast pad machine and Underarm pad machine.
Q: What is the delivery time for a set machine?
A: 120 days as a fastest delivery time. As a manufacture, we need time to make our machine perfect in every taspect.
Q: What is your term of payment?
A:T/T is our first choice, L/C at sight is ok as well.
Q: How long is the warranty period?
A: one year after the testing finished at the buyer's workshop.
Q: Will you send the engineer to install machine and train our workers in our factory
A: of course. We will send engineer to installing and training. But the salary and accommodation of technician will be on the buyer' s side. you can sent your engineers to our
factory for training, we will offer accommodation.
Q: How long can I get the machine?
we will begin to make your machine once we receive your 30% down payment.
around 4 month, we will finish the produce and ask the buyer to check the machine and pay for the rest money.
about 10 days for packing the machine, arrangment of shipping and customs clearance.
some days for the shipping and some days for the customs clearance in the buyers country.
Finally, you can get the machine.
Q: Can I buy raw material from your company?
A: yes. we have a trading company, which cooperate with us for many years. we can help you to find raw material.