Full-automatic high speed Baby Diaper Making Machine (YNK500-SV)
Quick Details
Condition |
Used |
Year |
2007 year |
Product Type |
Diaper Machine |
Processing Type |
Full-automatic high speed Baby Diaper Making Machine (YNK500-SV) |
Place of Origin |
Fujian, China (Mainland) |
Model Number |
YNK500-SV |
Certification |
CE,ISO certificates |
Warranty |
1 year |
After-sales Service Provided |
Engineers available to service machinery overseas |
Stable: |
yes |
Size of diaper: |
S, M, L, XL |
Finished product: |
baby diaper |
Control system |
full-automatic |
Waste rate |
less than 2% |
Operators |
6-8 operators including packing baby diaper |
Main Technical Parameter
Designed production speed |
600 pieces/min |
Stable production speed |
500 pieces/min(or as per customers designed) |
Machine power |
three-phase five-wire(380V, 50HZ) |
Machine capacity |
about 300-350KW(exclude hot melt applicators and air compressor |
Machine size |
30.0m*7.0m*3.5m(L*W*H)( (Can be customized) |
Machine weight |
about 60 Ttons(whole production line) |
Air pressure |
0.6-0.8Mpa |
Main Function Features
1.full-automatic with PLC control and touch screen;
2.High-speed teeth-like crusher;
3.Web-wheel molding;
4.SAP auto adding with amount control;
5.Servo unwinding,auto-tension control and auto splicing for raw material;
6.Auto reject for wasted & rejected product,auto detect & alarm for material exhausted;
7.Phase adjusting during running without stop;
8.Diaper tri-folding or bi-folding;
9.Diaper auto counting & stacking.
Packaging & Delivery
Packaging Details: wooden cases and plastic film for full automatic high speed baby diaper making machine
Delivery Details: within 120days Baby Diaper Machine
Models
Model |
Driven mode |
Speed(PCS/MIN) |
Weight(T) |
Capacity |
Machine size(L*W*H) |
YNK500SV |
full servo driving |
500-600 |
60 |
330kw |
31*8*5.5m |
YNK450HSV |
semi-servo driving |
400-450 |
60 |
240kw |
27*8*5.5m |
YNK400FC |
inverter driving |
400-450 |
60 |
190kw |
27*8*5.5m |
Our Services
Excellent After-sales service
1. You can send technicians to our factory to learn operating the machine before delivering
machine for 1-2 month.
2.When the machine arrive at your workshop, we will send technician to your workshop to
install, test the machine and train your workers.
3. If you need 1-3 Chinese technicians to work for you, we can help you to find them.
Why choose us
1.We can do full support for your complete project, from machine's
installment, supplying raw materials, designing your factory layout, workers training to
final production.
2.We can offer you very good machines and service at good price.(we have our own parts processing workshop)
3.We are factory manufacturer, not trading company.
Packing